Elliptic Outage History
13 incidents recorded over the last 365 days, 13 of them resolved. Durations are measured from when PulsAPI first saw the problem to when it cleared, which is usually longer than the vendor's own figure.
Every Recorded Elliptic Incident
| Date | Incident | Duration | Status |
|---|---|---|---|
| Oct 31, 2026 | [AML API (/v2/*/synchronous)] - Resource `post_/v2/wallet/synchronous` has a high p99 latencyWe've confirmed our MCP and blocklist were not impacting during this incident and remained fully available at all time. | 14h 19m | Resolved |
| Oct 30, 2026 | TRON Blockchain LagWe've fixed the core issue and are monitoring the situation as things recover. | 5h 6m | Resolved |
| Oct 23, 2026 | dYdX Blockchain LagWe are investigating for possible lag between Elliptic and the live tip of the blockchain. Please note you will still be able to analyse all other currencies as well as the historical data of the impacted blockchain as… | 66h 28m | Resolved |
| Oct 20, 2026 | Canton Blockchain LagWe are investigating for possible lag between Elliptic and the live tip of the blockchain. Please note you will still be able to analyse all other currencies as well as the historical data of the impacted blockchain as… | 38h 32m | Resolved |
| Oct 17, 2026 | Network-wide TON degradationThe network's new version (v2026.10) is live and we have upgraded today (23 Oct), but it has not solved the network reliability problems. With the TON network degraded, we can't expect a restoration of the service… | 243h 34m | Resolved |
| Oct 7, 2026 | [Blockchain Producers] Injective V2 - latest block timestamp is over 1200 seconds oldWe've fixed the core issue and are monitoring the situation as things recover. | 1h 26m | Resolved |
| Sep 22, 2026 | Cosmos Blockchain LagWe are investigating for possible lag between Elliptic and the live tip of the blockchain. Please note you will still be able to analyse all other currencies as well as the historical data of the impacted blockchain as… | 140h 23m | Resolved |
| Aug 25, 2026 | TON blockchain lagWe've fixed the core issue and are monitoring the situation as things recover. | 2h 43m | Resolved |
| Aug 24, 2026 | Polkadot Blockchain LagWe've fixed the core issue and are monitoring the situation as things recover. | 23h 18m | Resolved |
| Aug 21, 2026 | SUI Blockchain LagWe've fixed the core issue and are monitoring the situation as things recover. | 2h 0m | Resolved |
| Aug 14, 2026 | XLayer Blockchain LagWe are investigating for possible lag between Elliptic and the live tip of the blockchain. Please note you will still be able to analyse all other currencies as well as the historical data of the impacted blockchain as… | 13h 12m | Resolved |
| Aug 12, 2026 | Gnosis Blockchain LagWe are investigating for possible lag between Elliptic and the live tip of the blockchain. Please note you will still be able to analyse all other currencies as well as the historical data of the impacted blockchain as… | 2h 58m | Resolved |
| Aug 11, 2026 | Hedera Blockchain LagWe've confirmed there is a problem, we're working to resolve it. | 3h 57m | Resolved |
Hear about the next one while it is open
Everything above is a record written after the fact. We can email you when the next Elliptic incident opens instead, at the point where knowing still changes what you do.
Free, no password, no card. Unsubscribe in one click.
How to Read This Elliptic Incident Log
Each row is an incident PulsAPI observed, not a summary written afterwards. The duration is wall-clock time between the first failing check and the first clean one, so it includes the window before Elliptic acknowledged anything. Vendor post-mortems typically measure from acknowledgement, which is why their numbers are usually shorter.
Incidents still open have no duration yet and are listed as ongoing rather than being given a running total. The archive covers the last 365 days; anything older has aged out of the window rather than never having happened.
The longest single Elliptic outage in this window ran 10d 3h, against a mean recovery of 1d 18h. If you depend on Elliptic in a customer-facing path, the longest figure is the one to design around. The mean is what happens on a normal bad day; the maximum is what happens on the worst one.