Mailjet Outage History
6 incidents recorded over the last 365 days, 4 of them resolved. Durations are measured from when PulsAPI first saw the problem to when it cleared, which is usually longer than the vendor's own figure.
Every Recorded Mailjet Incident
| Date | Incident | Duration | Status |
|---|---|---|---|
| Nov 20, 2026 | Mailjet Application Performance Degradation and Intermittent Login IssueThis incident has been resolved. | 31 min | Resolved |
| Nov 13, 2026 | Microsoft Incident Resulting in Delivery Issues to M365This incident has been resolved. | 10h 24m | Resolved |
| Sep 23, 2026 | Infrastructure MaintenanceThe scheduled maintenance has been completed. | 1h 0m | Scheduled |
| Sep 4, 2026 | Microsoft Incident Resulting in Delivery Issues to M365This incident has been resolved. | 31 min | Resolved |
| Jun 5, 2026 | Support Ticket Creation FailuresThis incident has been resolved. | 31 min | Resolved |
| Apr 16, 2026 | Infrastructure MaintenanceThe scheduled maintenance has been completed. | 1h 0m | Scheduled |
Hear about the next one while it is open
Everything above is a record written after the fact. We can email you when the next Mailjet incident opens instead, at the point where knowing still changes what you do.
Free, no password, no card. Unsubscribe in one click.
How to Read This Mailjet Incident Log
Each row is an incident PulsAPI observed, not a summary written afterwards. The duration is wall-clock time between the first failing check and the first clean one, so it includes the window before Mailjet acknowledged anything. Vendor post-mortems typically measure from acknowledgement, which is why their numbers are usually shorter.
Incidents still open have no duration yet and are listed as ongoing rather than being given a running total. The archive covers the last 365 days; anything older has aged out of the window rather than never having happened.
The longest single Mailjet outage in this window ran 10h 24m, against a mean recovery of 2h 20m. If you depend on Mailjet in a customer-facing path, the longest figure is the one to design around. The mean is what happens on a normal bad day; the maximum is what happens on the worst one.