Nordu Outage History

7 incidents recorded over the last 365 days, 2 of them resolved. Durations are measured from when PulsAPI first saw the problem to when it cleared, which is usually longer than the vendor's own figure.

Every Recorded Nordu Incident

Nordu incidents, newest first, with date, duration and status.
DateIncidentDurationStatus
Oct 21, 2026Kaltura services temporarily unavailableKaltura and BOX IDP are down for emergency maintenance pending a fix for current php vulnerability190h 21mResolved
Oct 21, 2026KalturaScheduled Maintenance4h 45mScheduled
Sep 29, 2026Hardware Maintenance (Ørestad)Scheduled Maintenance4h 51mScheduled
Sep 29, 2026Hardware Maintenance (Ørestad) Scheduled Maintenance4h 51mScheduled
Sep 22, 2026Emergency maintenance for KalturaScheduled Maintenance2h 0mScheduled
Sep 21, 2026Emergency maintenance for KalturaScheduled Maintenance2h 0mScheduled
Apr 17, 2026Zoom issueWe have got reports about bad picture and sound quality in meetings. We are troubleshooting.4839h 56mResolved

Hear about the next one while it is open

Everything above is a record written after the fact. We can email you when the next Nordu incident opens instead, at the point where knowing still changes what you do.

Free, no password, no card. Unsubscribe in one click.

How to Read This Nordu Incident Log

Each row is an incident PulsAPI observed, not a summary written afterwards. The duration is wall-clock time between the first failing check and the first clean one, so it includes the window before Nordu acknowledged anything. Vendor post-mortems typically measure from acknowledgement, which is why their numbers are usually shorter.

Incidents still open have no duration yet and are listed as ongoing rather than being given a running total. The archive covers the last 365 days; anything older has aged out of the window rather than never having happened.

The longest single Nordu outage in this window ran 201d 15h, against a mean recovery of 30d 1h. If you depend on Nordu in a customer-facing path, the longest figure is the one to design around. The mean is what happens on a normal bad day; the maximum is what happens on the worst one.