Zanda Outage History
7 incidents recorded over the last 365 days, 1 of them resolved. Durations are measured from when PulsAPI first saw the problem to when it cleared, which is usually longer than the vendor's own figure.
Every Recorded Zanda Incident
| Date | Incident | Duration | Status |
|---|---|---|---|
| Nov 5, 2026 | Scheduled System Maintenance on my.zandahealth.com (overnight)Scheduled Maintenance | 30 min | Scheduled |
| Nov 4, 2026 | Scheduled System Maintenance on my.zandahealth.com (overnight)Scheduled Maintenance | 40 min | Scheduled |
| Oct 26, 2026 | Scheduled System Maintenance on uk.zandahealth.comScheduled Maintenance | 1h 30m | Scheduled |
| Oct 24, 2026 | Scheduled System Maintenance on uk.zandahealth.comScheduled Maintenance | 30 min | Scheduled |
| Oct 20, 2026 | Scheduled System Maintenance on us.zandahealth.com - Oct 19-20 (overnight)Scheduled Maintenance | 30 min | Scheduled |
| Oct 19, 2026 | Scheduled System Maintenance on us.zandahealth.com - Oct 18-19 (overnight)Scheduled Maintenance | 1h 0m | Scheduled |
| Oct 13, 2026 | Zanda not loading or slow to load, error code 500 for some users | 11 min | Resolved |
Hear about the next one while it is open
Everything above is a record written after the fact. We can email you when the next Zanda incident opens instead, at the point where knowing still changes what you do.
Free, no password, no card. Unsubscribe in one click.
How to Read This Zanda Incident Log
Each row is an incident PulsAPI observed, not a summary written afterwards. The duration is wall-clock time between the first failing check and the first clean one, so it includes the window before Zanda acknowledged anything. Vendor post-mortems typically measure from acknowledgement, which is why their numbers are usually shorter.
Incidents still open have no duration yet and are listed as ongoing rather than being given a running total. The archive covers the last 365 days; anything older has aged out of the window rather than never having happened.
The longest single Zanda outage in this window ran 1h 30m, against a mean recovery of 42 min. If you depend on Zanda in a customer-facing path, the longest figure is the one to design around. The mean is what happens on a normal bad day; the maximum is what happens on the worst one.