Zanda Outage History

7 incidents recorded over the last 365 days, 1 of them resolved. Durations are measured from when PulsAPI first saw the problem to when it cleared, which is usually longer than the vendor's own figure.

Every Recorded Zanda Incident

Zanda incidents, newest first, with date, duration and status.
DateIncidentDurationStatus
Nov 5, 2026Scheduled System Maintenance on my.zandahealth.com (overnight)Scheduled Maintenance30 minScheduled
Nov 4, 2026Scheduled System Maintenance on my.zandahealth.com (overnight)Scheduled Maintenance40 minScheduled
Oct 26, 2026Scheduled System Maintenance on uk.zandahealth.comScheduled Maintenance1h 30mScheduled
Oct 24, 2026Scheduled System Maintenance on uk.zandahealth.comScheduled Maintenance30 minScheduled
Oct 20, 2026Scheduled System Maintenance on us.zandahealth.com - Oct 19-20 (overnight)Scheduled Maintenance30 minScheduled
Oct 19, 2026Scheduled System Maintenance on us.zandahealth.com - Oct 18-19 (overnight)Scheduled Maintenance1h 0mScheduled
Oct 13, 2026Zanda not loading or slow to load, error code 500 for some users11 minResolved

Hear about the next one while it is open

Everything above is a record written after the fact. We can email you when the next Zanda incident opens instead, at the point where knowing still changes what you do.

Free, no password, no card. Unsubscribe in one click.

How to Read This Zanda Incident Log

Each row is an incident PulsAPI observed, not a summary written afterwards. The duration is wall-clock time between the first failing check and the first clean one, so it includes the window before Zanda acknowledged anything. Vendor post-mortems typically measure from acknowledgement, which is why their numbers are usually shorter.

Incidents still open have no duration yet and are listed as ongoing rather than being given a running total. The archive covers the last 365 days; anything older has aged out of the window rather than never having happened.

The longest single Zanda outage in this window ran 1h 30m, against a mean recovery of 42 min. If you depend on Zanda in a customer-facing path, the longest figure is the one to design around. The mean is what happens on a normal bad day; the maximum is what happens on the worst one.